As can be seen in the below profiles, electrical production is highly variable depending on the season. The highest production of electricity, not surprisingly, happens during late spring and summer months.

Water Filtration Plant - 71 Stonehouse Hill Road, Holden MA

  • Size: PV 1: 60 kW DC; PV 2: 65 kW DC
  • Manufacturer: Kyocera Solar, Inc.
  • Location: PV 1: Roof; PV 2: Ground
  • Date Installed: PV 1: June 2011; PV 2: February 2012

North High School - 150 Harrington Way, Worcester

  • Size: 30.2 kW DC
  • Manufacturer: Solyndra
  • Location: Roof
  • Date in Service: July 2011

Sullivan Middle School - 140 Apricot Street, Worcester

  • Size: 186 kW DC
  • Manufacturer: Sharp
  • Location: Roof
  • Date in Service: January 2014

Worcester Technical High School - 1 Skyline Drive, Worcester

  • Size: 256 kW DC
  • Manufacturer: Sharp
  • Location: Roof
  • Date Installed: March 2014

Municipal Solar Electricity Production

Total electricity generated by municipal solar installations has steadily grown over the last three years as new projects were gradually coming on-line:

 